Standard Mode

Standard Mode
Standard mode piling involves the operation of pressing piles into the ground un-aided by auxilary equipment.
The Silent Piler under optimum ground conditions will press-in piles of up to 15 metres in length by utilising the reaction force generated by the GIKEN Reaction Base sysytem. Then the Silent Piler sits atop of already installed piles and continues to install, by self moving along the pile line, as shown below.

U Piling Procedure